Evaluation unit request for GPS trackers and MDVRs

Asking for evaluation units without a plan costs weeks. Write the pilot brief first: which vehicles, what you want to prove, what counts as a pass, and how long it runs. You get a one-page request summary to send with your contact request.

  • Runs in your browser
  • No promise of stock, price or delivery date
  • Summary by email
This page does not reserve units

It builds your brief only. Availability, loan terms and timing are confirmed by the Tracom team in writing after you contact them.

Every value is an example. Replace it with your own fleet and your own pilot plan.

Vehicle types
Vehicle typeIn your fleetIn the pilotRemove

Count the vehicles you operate and the ones you want to fit for the evaluation. Up to 8 types.

Pilot plan
weeks

How long the units stay on the vehicles. A longer pilot sees more shifts, routes and weather.

days / week

The days the pilot vehicles normally work.

locations

Depots, yards or project sites. More locations mean more installation visits.

Installation is part of the pilot plan. Choose what you expect today.

Products to evaluate

Choose what you want to test. The Tracom team confirms what can be arranged for an evaluation.

How this is calculated
fleet = sum of vehicles in every type pilot share = pilot vehicles ÷ fleet required type = a type with at least 10 % of the fleet (typical) suggested pilot = max(3, sum of min(type size, 2) over required types) (typical) operating days = weeks × operating days per week vehicle-days = pilot vehicles × operating days

Full method below.

Pilot coverageBased on values entered

Take the brief to the Tracom team

A request summary with the pilot plan, the coverage, the pass lines and the open items.

Request summary

Get the request summary for your contact request

  • Pilot size, duration and operating days
  • Coverage of your vehicle types
  • Pass lines with priority and method
  • Readiness check with the open items
  • Next steps and what to expect

What does the tracker and MDVR evaluation unit request builder do?

It helps you write the brief for a pilot of Tracom devices before you contact the team. You list your vehicle types, choose the vehicles for the pilot, set the duration and write the pass lines: the numbers the pilot must reach to count as a success.

The tool gives three answers. The fleet and pilot tab shows how much of your fleet the pilot covers and which vehicle types are missing. The pass lines tab checks that every line has a priority, a way to measure it and enough days. The summary tab scores the brief and lists what is still open.

It does not reserve units, and it does not quote a price or a date. Tracom confirms availability, loan terms and timing in writing after you contact the team.

Why write a pilot brief first?

  • A clear target. A pilot with no pass lines ends in opinions. A pilot with five numbers ends in a decision.
  • A fair sample. Ten vehicles of one type say little about a fleet of four types. The brief shows the gaps before any unit ships.
  • Enough time. Some lines need weeks of data, such as days online or fuel level against a manual check. A two-week pilot cannot judge them.
  • Less back and forth. A request that states the vehicles, the products and your dates is easier to answer than a one-line email.

What should you enter?

FieldWhat it meansTip
Vehicle typesGroups of vehicles that behave differently, such as pickups, trucks, buses and heavy equipment.Use the types you manage today and the counts you can verify.
Pilot vehiclesHow many vehicles of each type receive units.Include at least one vehicle of every type that holds a real share of the fleet.
Pilot durationWeeks the units stay on the vehicles, and the operating days per week.Count operating days, not calendar days.
Pass linesThe measure, the number, the priority and how you will check it.Write the number before the pilot starts and keep it.
ProductsWhich Tracom devices you want to test.Choose only what you can install and review during the pilot.
ConditionsYour decision date, the pilot lead on your side and the loan terms acknowledgement.Your decision date is your own plan. It does not change Tracom lead times.

How does a pilot run?

The steps are the same for a few trucks or a few hundred vehicles. This page covers the first one.

  1. Write the brief

    Use this tool. Decide the pass lines before you talk about hardware.

  2. Agree the terms in writing

    Contact the Tracom team with your summary. Availability, loan terms and timing are confirmed in writing, not on this page.

  3. Install and run

    Fit the units on the pilot vehicles, keep a note of every problem and run for the full duration.

  4. Review against the pass lines

    Compare each result with the number you wrote. Decide on the day you planned.

What evidence does each pass line need?

Most lines can be checked in more than one way. The table shows the usual method and the ones that can work. Pick one and write it in the brief.

  • Usual
  • Possible
  • Not usual
Pass linePlatform reportRide-along or site checkInstaller logYour own records
Position reports receivedUsualPossibleNot usualPossible
Delay from event to screenUsualUsualNot usualNot usual
Trips matching your own recordsUsualNot usualNot usualUsual
Driver behavior events confirmed on reviewUsualUsualNot usualPossible
Video clips retrieved when requestedUsualPossibleNot usualNot usual
Install time per vehicleNot usualNot usualUsualPossible
Days online per vehicleUsualNot usualNot usualNot usual
Fuel level against a manual checkUsualPossibleNot usualUsual
Reports you need that can be producedUsualNot usualNot usualPossible

How is the brief checked?

The tool does simple arithmetic on your inputs. The planning values it uses are typical numbers that the Tracom team can replace.

fleet = sum of vehicles in every type pilot share = pilot vehicles ÷ fleet required type = a type with at least 10 % of the fleet (typical) suggested pilot = max(3, sum of min(type size, 2) over required types), capped at the fleet (typical) operating days = weeks × operating days per week vehicle-days = pilot vehicles × operating days

Each pass line has a typical minimum number of operating days before it can be judged. Position reports need a few days. Days online and fuel checks need weeks. Lines marked nice-to-have are not judged.

readiness = checks passed ÷ 9 × 100 ready to send = 85 % or more · add the open items = 60 % to 84 % · not ready = below 60 %

The nine checks are: pilot size, a product chosen, enough pass lines, one must-have line, a method for each must-have line, enough operating days, every required vehicle type covered, loan terms acknowledged and an installation plan.

Worked example: 12 vehicles in a fleet of 120

A fleet has 120 vehicles in four types and plans a 6-week pilot with 5 operating days a week. These figures are examples.

Example brief
ItemValue
Fleet60 pickups + 35 trucks + 15 buses and vans + 10 heavy equipment = 120 vehicles
Pilot vehicles4 + 4 + 2 + 2 = 12, which is 10 % of the fleet
Required typesPickups 50 %, trucks 29 %, buses and vans 12.5 %. Heavy equipment is 8 %, below 10 %.
Suggested pilotmax(3, 2 + 2 + 2) = 6 vehicles
Operating days6 weeks × 5 days = 30 days
Vehicle-days12 × 30 = 360
Pass lines6 lines, 3 of them must-have. The longest line needs 14 days, so 30 days is enough.
Readiness8 of 9 checks = 89 %. Only the loan terms line is open.

The pilot is larger than the suggested size, covers all four types and has enough days. Once the loan terms are acknowledged, the brief scores 100 %.

Common mistakes in a pilot request

  • Starting without pass lines. Without numbers, every result can be argued either way.
  • Testing one easy vehicle. A new truck on a short route will not show what your older vehicles do.
  • Judging too early. A line that needs two weeks of data cannot be judged on day three.
  • Changing the numbers during the pilot. Moving the pass line after the result defeats the purpose.
  • Treating the request as an order. A request starts a conversation. Stock, terms and timing come from Tracom in writing.

Assumptions and limits

The tool checks the balance and completeness of a brief. It does not know the performance of any device, so it never suggests a pass line value, and the values shown are placeholders to replace. The planning values (minimum pilot size, the share of the fleet that makes a type required, the minimum days for each pass line and the readiness thresholds) are typical numbers that the Tracom team can edit. Nothing here reserves units, quotes a price or sets a delivery date. Have your own team review loan terms before you sign. In some markets a local partner handles evaluation requests.

Related Tracom solution

Try Tracom devices on a few vehicles first

Tracom designs the ST100 tracker, the M1N MDVR, and the SCMS portal that configures them. Camera options such as DSM/ADAS are confirmed with the Tracom team. Send your brief to the Tracom team. They reply in writing on whether an evaluation can be arranged, on what terms and when.

  • ST100 tracker for position and trip records.
  • M1N MDVR for video. Camera options such as DSM/ADAS are confirmed with the Tracom team.
  • SCMS portal to configure devices.
  • Over-the-air updates so a firmware change does not need a visit.
Questions

Questions about evaluation unit requests

Want to talk it through? Contact Us.

What is an evaluation unit request?

It is a written request to try Tracom devices on a few of your vehicles before you buy or before you bid. A good request states the vehicles, the products, the duration and the pass lines.

Does this page reserve units or promise a delivery date?

No. The page builds your brief only. Availability, loan terms and timing are confirmed by the Tracom team in writing after you contact them.

How many vehicles should an evaluation include?

Enough to cover each vehicle type that holds a real share of your fleet, and at least a few vehicles. The tool suggests a starting size from your own mix. The planning values it uses are typical, not Tracom rules.

How long should the pilot run?

Long enough to see your normal routes and shifts, and a refuelling or maintenance cycle if those matter to your pass lines. The tool compares your duration with a typical minimum for each line.

Where do the pass lines come from?

From you. Base them on your operation, your contract or your tender. The tool does not know how any device performs, so it does not suggest values, and the examples are only placeholders.

Where does Tracom's role end?

Tracom designs the devices and the portal. This tool helps you write a clear request. It does not approve your pass lines, reserve stock, quote a price or set a timeline. The Tracom team answers your contact request with the next steps, and in some markets a local partner may handle it.

Ready to ask?

Send your brief to the Tracom team

Attach your request summary to your contact request. Say which project or tender it supports and which dates matter to you.

Related tools and templates