Platform migration · Free Excel template

MDVR re-pointing checklist: moving devices off CMSV6

A plan for re-pointing an MDVR fleet from a CMSV6 server to another one. List the devices, decide what video and history to keep, map the reports, re-point the devices in waves and sign off.

Free: enter your name and email and we send you the file. Works in Excel, Microsoft 365, Google Sheets and LibreOffice Calc. No macros.
  • 44 tasks in 8 phases
  • Data-to-keep sheet
  • Cut-over readiness verdict
  • Every device, model and SIM listedDone
  • Recordings to keep exported and countedDone
  • Roll-back steps written downCheck
  • Pilot group signed off
What's inside

Eight phases, from the first inventory to sign-off

One workbook with eight sheets: Start here, Checklist, Devices, Data to keep, Reports, Plan, Summary and Lists.

  1. 1. Inventory

    Every vehicle, device model, device ID, SIM, channel count and storage type, and the server each device reports to today.

  2. 2. Data to keep

    Which recordings and histories you must keep, for how long and why. Export them and count the files.

  3. 3. Users and roles

    Who can view, edit and get video on the new platform. Leave old accounts behind.

  4. 4. Reports and alarms

    What the team uses every week, and what matches it on the new platform. Mark each one Same, Partly or Missing.

  5. 5. Re-point devices

    Back up the configuration, write the roll-back steps, change one test device and check it.

  6. 6. Pilot and parallel run

    A few vehicles of each model, compared with trips you know. A written go or no-go.

  7. 7. Cut-over and training

    Move the rest in waves. Train supervisors. Keep roll-back available until each wave is accepted.

  8. 8. Acceptance and close

    Every active device reports, the archive is checked, and the old platform stops only after sign-off.

The decision that matters most

What happens to each piece of history?

The Data to keep sheet asks for one decision per item. Nothing is moved by default.

Most useful

Migrate

Needed in daily work

Examples
Vehicle list, driver list, geofences, user roles
Check
Compare a sample on the new platform
Confirm with your supplier that it can be imported.

Archive only

Kept, but not used daily

Examples
Old recordings, issued reports, event history
Check
Count files against the export log
Store it safely and say who may open it.

Drop

No reason to keep

Examples
Test vehicles, accounts of people who left
Check
Make sure no contract or incident needs it
Write down who agreed.

What does a platform migration involve?

Moving a fleet is more than changing a server address. You also move people, reports, habits and history. The checklist keeps all of it in one plan, so nothing is found missing after the old platform is switched off.

The title names CMSV6 only as an example of the platform you may be leaving. The plan itself is neutral. It works for a move between any two platforms.

How to use the checklist

  1. Fill in Start here. Name the project, the lead, the current platform and the new one.
  2. List every device. Type the device ID as text, exactly as the device sends it.
  3. Decide on the data. One decision per item: migrate, archive only or drop.
  4. Map the reports. Ask supervisors what they open every week.
  5. Plan the waves. Dates, success criteria and the roll-back trigger for each stage.
  6. Work the Checklist and read the Summary. It shows open critical tasks, report gaps and how many devices have moved.

Why a pilot comes first

A pilot shows problems while only a few vehicles are affected. Pick a few vehicles of each model and each kind of use, and include one that works in weak coverage. Compare what the new platform shows with trips you already know.

Re-pointing a device

Re-pointing means changing the server address, port and protocol in the device so it reports to the new platform. The exact setting and method come from your device manual. Back up the configuration first and write down how to put the old values back.

Cut-over readiness = Not ready if a critical task in phases 1 to 6 is open Check = no critical task open, but report gaps or undecided data remainReady for cut-over = all of the above are clearCritical flags are our suggestion. Change them to fit your project.

Limits

Ask before you assume

This file is a plan. It does not say that any device, recording or setting can be moved between platforms, and Tracom has not tested every combination. Ask your supplier in writing what can be transferred. Check retention and notice periods against the current official text and your own contracts.

Related Tracom solution

Moving MDVR fleets to Tracom devices

Tracom M1N is a mobile DVR (MDVR). Camera options such as DSM/ADAS are confirmed with the Tracom team. Tracom devices send data to the Safee platform. Bring this checklist and we go through what can be moved from your current setup.

  • Tracom M1N MDVR. Camera options such as DSM/ADAS are confirmed with the Tracom team.
  • SCMS portal. Manage devices and configuration files in one place.
  • Advanced configuration files. Keep a known-good configuration for each model.
  • Over-the-air updates. Update device software without a workshop visit.
Questions

Migration questions, answered

Planning a move and want a second opinion? Talk to Tracom.

Does the checklist work for any platform?

Yes. The tasks are general: inventory, data, users, reports, re-pointing, pilot and sign-off. Type your own platform names on Start here.

Can I move my old recordings to the new platform?

It depends on both platforms and on the file format. Often the practical answer is to archive them and keep access for as long as you need. Ask your supplier in writing.

How long should the pilot run?

There is no fixed number. Set it on the Plan sheet so it covers each model, each kind of route and a working week at least. Your own risk review decides.

Do I need to keep the old platform running?

Keep access for roll-back and for the archive until sign-off. Read the notice and access terms in your contract first.

Which tasks are marked critical?

Twelve before cut-over and two after, such as written roll-back steps and a go or no-go from operations. They are suggestions. Change the Yes or No in column E.

What is Tracom's role here?

Tracom makes the devices. This checklist is a neutral planning tool and makes no claim about compatibility with any platform or device.

Next step

Planning a move to Tracom devices?

Bring the checklist and your device list. We will tell you what we can confirm and what we still have to test.

Related tools and templates

Keep going on migration

Get the report

Enter your details and we will email you the file.

Use your real name so the file arrives addressed to you. Don't worry, we won't flood you with emails or calls.

Scroll to Top